Good Practice - Project

Feasibility study on setting up a biogas plant

Punkalaidun municipality conducted a feasibility study for setting up a biogas plant producing energy from manure, which resulted in an investment decision.
  • CAP Implementation
  • - Programming period: 2014-2022 Finland
    - Programming period: 2014-2022 Finland

    General information

    RDP Priority
    • P5. Resource efficiency and climate
    RDP Focus Area
    • 5C: Renewable sources & waste management
    RDP Measure
    • M16: Cooperation

    Summary

    Punkalaidun is an agrarian municipality of 2 900 inhabitants. It is located on the best Finnish farming soils in the southwest part of the country. Animal husbandry, especially pig farms, are typical in the area. The growing amounts of slurry has provided a challenge to local producers on how it can be best used.

    The idea was thus to establish a biogas plant. Punkalaidun municipality carried out a positive feasibility study, which resulted in an immediate investment decision worth 4 million EUR. The project has a high transferability to other rural areas.

    Results

    The installation works on site are well underway.

    The treatment capacity is 10 000 tonnes of animal manure, crop residues and residues from food industry per year.

    The estimated annual output is 1 200 000 Nm3 of biogas with a gross energy content of around 6 400 MWh, equivalent to an annual fuel requirement of 550-600 natural gas vehicles.

    Promoter

    Punkalaidun municipality

    Funding

    Total budget 85 875 (EUR)
    EAFRD 36 067.50 (EUR)
    National/Regional 49 807.50 (EUR)

    Resources

    English language

    gp_fi_biogas_plant_feasibility_study_web_je.pdf

    (PDF – 357.64 KB)