Cover image

Good Practice - Project

Construction of the Bahna retention basin

The construction of two small water basins that minimise the risk of floods and offer a habitat that promotes biodiversity. 
  • CAP Implementation
  • Programming period: 2014-2022 Czechia
    Programming period: 2014-2022 Czechia

    General information

    RDP Priority
    • P4. Ecosystems management
    RDP Focus Area
    • 4B: Water management
    RDP Measure
    • M08: Investments in forest areas

    Summary

    The area of intervention is located in the protected area of natural water accumulation Brdy, which is also a Protected Landscape Area. On the site the precipitation water is naturally accumulated which causes floods. Thus action was needed to protect the surrounding settlements. At the same time, it was necessary to retain and control the water in the landscape in order to preserve biodiversity.

    The project consisted in the construction of a couple of small water basins with an earth-fill dam and functional objects such as bottom outlets and emergency spillways. The capacity of the lower basin at the normal level is 5 675 m3 and the upper basin of 12 240 m3. The building plots are accessible by local roads and paved paths.

    Results

    Overall, the function of the two small basins is irreplaceable in the Brdy landscape.

    The two basins enhance the retention and accumulation of water and thus have reduced the risk of floods. 

    The basins have reduced high water occurrences and have formed a new landscape feature that has a positive contribution in biodiversity. They provide a living space for many groups and species of animals - mammals, birds, amphibians, fish, reptiles, molluscs, insects and plants.

    The construction also increased public awareness about the Brdy area, thus it increased the interest of the public for the area as a touristic destination with an emphasis on the environment.

    Promoter

    Vojenské lesy a statky ČR s.p.

    Funding

    Total budget 4 026 831.44 (CZK)
    EAFRD 1 518 325.00 (CZK)
    National/Reg. 1 548 999.00 (CZK)
    Private 959 507.44 (CZK)

    Resources

    English language

    gp_cz_water_retention_basin_bahna_467_web_1.pdf

    (PDF – 350.92 KB)